Project Overview
Detailed route alignment, topographic survey, tower spot checks, foundation design reviews and conductor stringing planning for a 132kV line across remote terrain.
Key deliverables
- —Topographic survey across 72 km of ridge and valley.
- —Tower foundation design with local material adaptation.
- —Stringing and sagging with live-line safety protocols.
Technical Specifications
StatusComplete
District / LocationDang
Timeline12 months from survey mobilization to commissioning.
OutcomeA fully commissioned transmission route with safer tower placement, optimized corridor alignment and reliable delivery for the Dang region.
ClientKEC international Ltd