Project 02 · Sindhupalchok
Tower Foundation Work
← Back to All Projects
Project Overview
Advance site preparation, soil stabilization and access road layout for tower foundations.
Key deliverables
- —Geotechnical study for steep embankments.
- —Access road alignment for heavy equipment.
- —Concrete tower pad design with drainage management.
Technical Specifications
StatusPlanning
District / LocationSindhupalchok
Timeline8 months of design, permitting and foundation execution.
OutcomeSecure tower bases with minimal slope disturbance and reliable load-bearing capacity.
ClientRegional transmission developer